Customization: | Available |
---|---|
Car Make: | Shacman |
Car Model: | HOWO |
Still deciding? Get samples of US$ 500/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The crankshaft is the main rotating part of the engine. After the connecting rod is installed, the up and down (reciprocating) movement of the connecting rod can be transformed into a cyclic (rotating) movement. It is an important part of the engine. Its material is made of carbon structural steel or ductile iron. It has two important parts: main shaft neck, connecting rod neck, (and others). The main journal is installed on the cylinder body, the connecting rod neck is connected with the big end hole of the connecting rod, and the small end hole of the connecting rod is connected with the cylinder piston. It is a typical crank slider mechanism.
The lubrication of the crankshaft mainly refers to the lubrication of the connecting rod bearing bush and the connecting rod neck of the crankshaft and the lubrication of the fixed points at both ends. The rotation of the crankshaft is the power source of the engine. It is also the source of power for the entire mechanical system.
Product name | 61500020071 Sinotruk Truck Spare Parts Crankshaft |
Brand | SDMANCA |
Model number | 61500020071 |
Manufacturer | SHANDONG MANDA MACHINERY EQUIPMENT CO., LTD. |
Application | TRUCK PARTS |
Place of origin | JINAN SHANDONG |
Color | Picture |
Product parameter | Standard |
Packing information | Carton, Pallet, Box, Bulk |
Truck Model | Sinotruk |
Condition | End product |
Quality | Original, OEM, High Copy, Copy |
Product Unit | Pcs |
MOQ | 1 |
Payment Terms | L/C, T/T, D/P, WESTERN UNION |
Port | Jinan, Shanghai, Qingdao, Guangzhou |
Q1. What is your terms of packing?
A: Generally, we pack our goods in carton boxes and then in wooden case.
Q2. What is your terms of payment?
A: T/T, L/C accept.
Q3. What is your terms of delivery?
A: EXW, FOB, CIF, DAF etc.
Q4. How about your delivery time?
A: Generally, it will take 3 to 7 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long-term and good relationship?
A: We keep good quality and competitive price to ensure our customers benefit.